7.
For each cable, connect the DC+ and DC- conductors to the applicable DC terminals.
Connect the cable shield to the PE busbar. Use the bolts, nuts, and washers
included in the delivery, and the connection method specified in
in cable lug connections (page
fasteners and a tightening torque of 70 N·m (52 lbf·ft). For the PE connection(s),
use M10 fasteners and a tightening torque of 42 N·m (31 lbf·ft).
8.
If there are more than 3 cables, attach additional cable support brackets for them.
9.
Lead the monitoring cable for the energy storage disconnector into the unit and
connect it to the applicable terminals. For more information, refer to the control
cable connection instructions.
10. At the energy storage, connect the cables according to the instructions of the
energy storage manufacturer.

Installing shrouds

1.
Install the shrouding removed earlier.
2.
Close the cubicle door.
30). For the DC terminal connections, use M12
Electrical installation 35