Mitsubishi Electric CR750-D Series Instruction Manual page 114

Circular arc tracking function
Hide thumbs Also See for CR750-D Series:
Table of Contents

Advertisement

10 Maintenance of robot program
10.2.
Timing Diagram of Dedicated Input/Output Signals
10.2.1. Robot Program Start Processing
The signal timing when a robot program is started from an external device is shown below.
PLC
Robot
Turning servo ON
(SRVON)
Servo ON
(SRVON)
Program selectable
(SLOTINIT)
Program reset
(SLOTINIT)
Operating
(START)
Start
(START)
Stop
(STOP)
(1) PLC sets "servo ON H" when it detects "turning servo ON L." The robot turns the servo power supply on and
sets "turning servo ON H." PLC acknowledges "turning servo ON H" and sets "servo ON L."
(2) PLC sets "program reset H" upon receiving "program selectable L." The robot returns to the beginning of the
program and sets "program selectable H" when the program becomes ready to be started. PLC sets
"program reset L" when it detects "program selectable H."
(3) PLC acknowledges "turning servo ON H," "program selectable H" and "operating L" and sets "start H."
The robot sets "program selectable L" and "operating H" when it detects "start H." PLC confirms "operating
H" and sets "start L."
(4) If a stop signal is input, the following processing is performed.
Upon receiving "stop H" from PLC, the robot sets "operating L."
10-104 Timing Diagram of Dedicated Input/Output Signals
H
L
H
L
H
L
H
L
H
L
H
L
H
L

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr751-d seriesCr750-q seriesCr751-q series

Table of Contents