Exporting The Job History To A Csv File; Viewing The Job Summary - HP 12000 User Manual

Hp 12200 gateway virtual library system user guide (bw403-10001, june 2011)
Hide thumbs Also See for 12000:
Table of Contents

Advertisement

The job history table displays for each job:
Barcode
Start and end times
Size in MB
Data transfer time
Total processing time
Transfer rate
Source and target locations
The node the job is running on
Completion status
Compression (yes or no)
The performance graph maps the MB per second against the time it took the jobs to complete.
To change the jobs included in the job history report, select a View previously created on the
Configuration screen. If you haven't set up any views:
1.
Select a location category. The options are SAN, LAN/WAN, All locations, and predefined
Views.
2.
Select the specific locations of interest from the Available Locations box. You can select multiple
devices by using Ctrl+click.
3.
Using the >> button, or by double-clicking, move the locations of interest into the Selected
Locations box. These are the locations that will display in the report. You can use << button
to remove locations from the Selected Locations box.
4.
Enter the number of days the report should include.
NOTE:
Configuration screen.
5.
Select a new location type; the default is Both. You can change the report to include only the
jobs where the selected devices acted as:
Target — the selected device receives the data.
Source — the selected device sends the data.
6.
Select Update. The job history table and performance graph update to include jobs based on
the new criteria.

Exporting the Job History to a CSV File

The CSV export file is a text file, delivered as a .zip. Each line is the record for one device, and
the data fields are separated by commas or columns depending on the program used to view the
file.
You can export the data currently displayed in the history by selecting Export Displayed Data from
the task bar, or select Export All Data which allows you to choose the number of days included in
the exported file. In both cases, the File Download window opens for you to determine where to
save the file.

Viewing the Job Summary

On the Job Summary screen you can see the number of successful, failed, and rescheduled jobs
both coming in and going out from the current device. By default, it displays one day of data with
the device acting as the Source.
68
Automigration/Replication
Changing the number of days here does not affect the default number set on the

Advertisement

Table of Contents
loading

This manual is also suitable for:

12200

Table of Contents