Mitsubishi Electric MN converter Operating Manual page 49

Electric air-conditioner network system
Hide thumbs Also See for MN converter:
Table of Contents

Advertisement

3.10.3 Screen Functions and Operation(BC Controller)
(1) Click on the button corresponding to the valve number
you want to change.
"0" represents "close" and "1" represents "open".
To change the valve setting, perform
"Fix Release" --> "Fix"
(2) After setting, click on
(3) Click on
(4) Change the LEV opening with
opening. Click on
contents.
(5) After adjustment by solenoid valve and LEV opening change is complete, click on
The Main Screen will return. At this time, the contents set at this screen become invalid.
NOTE:
To prevent failure to release the status set after test run, close the operation control screen of
BC/BS controller.
This releases all the content set on this screen automatically.
However when moving to the operation control screen of BC/BS controller from the operation monitor
screen,
the set content will be retained even by closing this screen.
At a timing when finishing the operation monitor screen, the set content can be released.
.
to check the current conditions.
. Set to the LEV
to send the setup
48
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G-50aMaintenance tools for mn converter & g-50a

Table of Contents