Mitsubishi Electric MN converter Operating Manual page 79

Electric air-conditioner network system
Hide thumbs Also See for MN converter:
Table of Contents

Advertisement

The function allotment of DIDO Controller, G(B)-50A Web,TG-2000A and Maintenance Tools is as follows.
Function name
Address setting
Output method
(Level/pulse) setting
Error input logic (a
contact/b contact) setting
Group registration
Operation and monitoring
Time setting
*1 It is set with Dip switch of DIDO Controller.
*2 When G(B)-50A or TG-2000A is connected, the time setting must be made on G(B)-50A Web Browser or TG-2000A.
The following settings and monitoring can be made on DIDO Controllers (PAC-YG66DCA).
Set the current time before using the DIDO Controller.
When G(B)-50A or TG-2000A is connected, the time setting must be made on G(B)-50A Web or
TG-2000A.
When neither of them is connected, refer to section [3.13.1.1 Time setting on DIDO Controllers].
(a) Operation
*Contact output
*Operation time reset
(b) Monitoring
*Input/output status
*Operation time (contact ON/OFF hours)
*Dip switch settings
3.13.1.1 Time setting on DIDO Controllers
NOTE:
When G(B)-50A or TG-2000A is connected, the time setting must be made on G(B)-50A Web or TG-2000A.
(1) Click [Option] in the menu bar and
select [DIDO/AI/PI] -> [DIDO setting] in
the sub-menu.
(2) Click
of the unit (DIDO Controller)
to be set or monitored on the Main screen.
(3) DIDO controller (66DC) input/output status
monitoring screen will appear.
(4) Click [Date/Time setting] in the
DIDO controller (66DC) input/output status
monitoring screen.
[Note]S:Setting possibility, M:Monitoring only, -:None
DIDO Controller
G(B)-50A
S
*1
S
*1
S
*1
-
-
-
78
TG-2000A
Web
-
-
-
-
-
-
S
S
S
S
S
S
Maintenance Tools
M
M
M
-
M
(Compulsion operation is
possible.)
M
(Operation is possible)*2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G-50aMaintenance tools for mn converter & g-50a

Table of Contents