11B-28
ENGINE OVERHAUL -
SECONDARY AIR SYSTEM AND INTAKE MANIFOLD
REMOVAL AND INSTALLATION
8
9
20 ± 2 N•m
36 ± 6 N•m
11
31 ± 3 N•m
Removal steps
1. Exhaust manifold heat protector
2. Vacuum hose and pipe
"DA 3. Air pipe assembly
4. Air control valve gasket
5. Air control valve assembly
6. Engine hanger
"CA 7. Air control valve bracket
Secondary Air System and Intake Manifold
22 ± 4 N•m
36 ± 6 N•m
5 ± 1 N•m
36 ± 6 N•m
13
10
5
6
7
23 ± 4 N•m
11 ± 1 N•m
49 ± 5 N•m
2
12
"BA 8. Manifold differential pressure (MDP)
sensor
9. O-ring
"AA 10. Intake manifold stay
11. Alternator brace stay
12. Intake manifold
13. Intake manifold gasket
22 ± 4 N•m
24 ± 3 N•m
4
11 ± 1 N•m
3
14 ± 1 N•m
14 ± 1 N•m
1