Intake Manifold - Mitsubishi Electric Lancer Evolution-VII Workshop Manual

Table of Contents

Advertisement

15-16

INTAKE MANIFOLD

REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
Air Duct Removal and Installation (Refer to P.15-8.)
D
Strut Tower Bar Removal and Installation
D
(Refer to GROUP 42.)
Under Cover Removal and Installation
D
(Refer to GROUP 51 - Front Bumper.)
Engine Coolant Draining and Supplying
D
(Refer to GROUP 14 - On-vehicle Service.)
Throttle Body Removal and Installation (Refer to
D
GROUP 13A - Throttle Body.)
11 ± 1 N·m
9
5.0 ± 1.0 N·m
10
11
12
(Engine oil)
Removal steps
1. Center cover
2. Oxygen sensor connector
connection
3. Injector connector connection
4. Fuel pressure solenoid valve
connector connection
5. Purge control solenoid valve
connector connection
6. Knock sensor connector connection
7. Vacuum hose connection
8. Vacuum hose
9. Fuel return hose connection
INTAKE AND EXHAUST -
8
14
14
7
13
17
18
Intake Manifold
Crossmember Bar Removal and Installation (Refer
D
to GROUP 32 - Engine Roll Stopper, Centermember.)
Front Exhaust Pipe Removal and Installation (Refer
D
to GROUP 15 - Exhaust Pipe and Main Muffler.)
Secondary Air Control Valve Bracket Removal and
D
Installation (Refer to P.15-14.)
Engine Oil Draining and Supplying
D
4
3
8
6
5
16
(Engine oil)
"AA 10. Fuel high-pressure hose connection
11. O-ring
12. Delivery pipe, Injector and fuel
AA"
pressure regulator assembly
13. Insulator
14. Insulator
15. Oil level gauge and guide
16. O-ring
17. Brake booster vacuum hose
connection
18. Purge hose connection
1
3.0 ± 0.5 N·m
2
15
13 ± 1 N·m

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents