Forced Shutdown - NEC R120d-1E N8100-1954F Maintenance Manual

Express5800 series
Hide thumbs Also See for R120d-1E N8100-1954F:
Table of Contents

Advertisement

Chapter 1 Maintenance
7.3

Forced Shutdown

Use this function when an OS command does not shut down the server, POWER Switch does not turn off the
server, or software reset does not work.
Continue to hold POWER Switch of the server for at least 4 seconds. The power is forcibly turned off. (To turn
on the power back again, wait approximately 40 seconds after turning off the power).
Express5800/R120d-1E (2.5-inch Drive Model)
Express5800/R120d-1E (3.5-inch Drive Model)
Note
If the remote power-on function is used, cycle the power once to load the OS after
the power has been forcibly turned off, and then turn off the power again by
shutting down the OS.
Express5800/R120d-1E, R120d-2E Maintenance Guide
7. Resetting and Clearing the Server
POWER switch
(Keep pressing for at least 4 seconds)
POWER switch
(Keep pressing for at least 4 seconds)
45

Advertisement

Table of Contents
loading

Table of Contents