Turning On The Server - NEC 140He User Manual

140he
Table of Contents

Advertisement

3-10

TURNING ON THE SERVER

Turn on the server and follow the on-screen instructions for setup.
IMPORTANT:
Some optional boards require setups with the SETUP utility before installation. If the
server has a PCI board with the PCI-to-PCI bridge installed, the SETUP utility is
enabled to launch. Check on the board specifications to find out whether it requires
pre-installation setups before actually installing the board.
Some installed optional devices or connected peripheral devices require setups before
proceeding to the next step.
To use the server with no optional devices installed besides the graphic board, install the
desired operating system to the server.
1.
Make sure that the floppy disk drive contains no floppy disk and the CD-ROM drive contains no bootable
CD-ROM.
2.
Press the POWER switch.
NOTES:
If the power cord is connected to the power control unit such as the UPS, turn on the
power control unit.
Connect the power cord and wait for about 30 seconds before pressing the POWER
switch. The POWER switch does not work for about 30 seconds after connecting the
power cord due to BMC (Baseboard Management Controller) firmware start-up.
Do not turn off the server until characters following our logo appear on the screen. The
time until the characters appear depends on your system configuration. Approximately,
it may take one to five minutes.
POWER/SLEEP lamp
Before turning on the server:
POWER switch

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/140heNec express5800 series

Table of Contents