Husqvarna TE 250 Workshop Manual page 263

Hide thumbs Also See for TE 250:
Table of Contents

Advertisement

Reassemble the reservoir plug and the valve, fit it inside the reservoir, then fit the snap
ring into the throat. Insert the nitrogen valve - or the air valve if teh nitrogden valve is not
an hand - using 10-12 bar pressure. Reassemble the cap on the valve and check to make
sure that both air bleeds, or oil leaks, are not present.
Set the plug on the body
Reassembling the end-of-stroke pad and its washer.
When the end-of-stroke pads needs to be replaced, block the forkrod in a vice using
aluminium or bronze jaws, then tighten the connection again using Loctite and a 50 Nm
torque. Reassemble the spring and take it to the initial preload using the ring nut and the
counter ring nut.
The manufacturerdeclines any and all responsability for damages deriving
from operations uncorrectly carried out.
TE: L= 243,5÷246,5 mm (9.58÷9.70 in.)
SMR: L= 234,5÷237,5 mm (9.23÷9.35 in.)
Part. N. 8000 B0148 (02-2008)
REAR SUSPENSION
J.13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents