Bleeding The Ptt Unit - Yamaha 55DEHD Service Manual

Hide thumbs Also See for 55DEHD:
Table of Contents

Advertisement

3. Install the tilt ram assembly into the tilt
cylinder, and then tighten the tilt cylinder
end screw 1 to the specified torque.
2
1
NOTE:
Place the tilt cylinder end screw at the bottom
of the tilt ram and install the tilt ram assembly
into the tilt cylinder.
Cylinder-end screw wrench 2:
90890-06568
Tilt cylinder end screw 1:
90 N·m (9.0 kgf·m, 66.4 ft·lb)

Bleeding the PTT unit

1. Tighten the manual valve 1 by turning it
counterclockwise.
Manual valve 1:
3 N·m (0.3 kgf·m, 2.2 ft·lb)
2. Place the PTT unit in an upright position.
6885J11
3. Remove the reservoir cap, and then
NOTE:
The fluid level should be at the brim of the
filler hole.
4. If fluid is below the correct level, add fluid
5. Install the reservoir cap, and then tighten
68871280
6. Connect the PTT motor leads 2 to the
7. Reverse the PTT motor leads between
1
68871290
Tilt cylinder and trim cylinder
check the fluid level in the reservoir.
of the recommended type.
it to the specified torque.
Reservoir cap:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
battery terminals to fully retract the rams.
the battery terminals to fully extend the
rams.
L
2
G
L
2
G
Ram
PTT motor lead
Blue (L)
Up
Green (G)
Green (G)
Down
Blue (L)
1
2
3
4
5
6
68871300
7
8
68871310
9
Battery
terminal
+
-
+
-
7-62

Advertisement

Table of Contents
loading

This manual is also suitable for:

75aet85aed75aehd85aet75aed85aehd

Table of Contents