Fuel Cut Operation; Radiator Fan Control System; Radiator Fan Relay No. 2 And No.3 - Suzuki Ignis Service Manual

Rg413
Table of Contents

Advertisement

6E1-34 ENGINE AND EMISSION CONTROL SYSTEM
1
2

FUEL CUT OPERATION

INSPECTION
NOTE:
Before inspection, check to make sure that gear shift
lever is in neutral position (with A/T model, selector lever
in "P" range), A/C is OFF and that parking brake lever is
pulled all the way up.
1) Warm up engine to normal operating temperature.
2) While listening to sound of injector (1) by using sound scope
(2) or such, increase engine speed to higher than 3,000 r/
min.
3) Check to make sure that sound to indicate operation of injec-
tor stops when throttle valve is closed instantly and it is
heard again when engine speed is reduced to less than
about 2,000 r/min.

RADIATOR FAN CONTROL SYSTEM

SYSTEM INSPECTION
WARNING:
Keep hands, tools, and clothing away from engine cool-
ing fan to help prevent personal injury. This fan is electric
and can come on whether or not the engine is running.
The fan can start automatically in response to the ECT
sensor with the ignition switch in the "ON" position.
Check system for operation referring to Flow Table B-7 in Section
6.
If radiator fan fails to operate properly, check relay, radiator fan
and electrical circuit.

RADIATOR FAN RELAY NO. 2 AND NO.3

INSPECTION
1) Disconnect negative cable at battery.
2) Remove relay(s) from connector(s).
1. Radiator fan relay No. 2
2. Radiator fan relay No. 3

Advertisement

Table of Contents
loading

Table of Contents