ABB IndustrialIT Compact HMI 800 Getting Started page 134

Table of Contents

Advertisement

Change the Windows Computer Name in the Server Node
c.
Figure 85. Communication parameters
d.
e.
29. Select the object PLC Connect Servers and the Deploy aspect.
30. Click Deploy.
31. When deploy has ended, the Node name change for the server is completed.
32. If clients are connected to the server each client needs to be updated as
described in the following four steps:
33. Log in as SysAdmin in the Client.
34. Open the Hosts file using Notepad and update the file with the new name of the
server.
35. Restart the client.
36. Connect the client to the system server as described in
Client Nodes
134
Click the Edit Driver button and the dialog in the figure below is
displayed.
Click the Update button and select the OPC server to be used as shown
above.
Click OK and then Apply to save the new configuration.
on page 135.
Section 7 Administration
Connect and Disconnect
3BSE040587R4401

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents