Setup Procedure - NEC Express 5800 Series Installation Manual

Hide thumbs Also See for Express 5800 Series:
Table of Contents

Advertisement

Chapter 1 Installing OS
1.

Setup Procedure

The flow-chart below illustrates the flow of the setup procedures for the server.
Use Internal Disk
1.3 Enabling internal disk
1.5 Disabling OS Boot Monitoring Function
1.1 Requirements for Setup
1.2 Preparations for Setup
Use Internal Disk
or
Use External Storage
1.7 Installing VMware ESXi
1.8 Installing ftSys Management Appliance
1.9 Installing ft control software
1.10
Applying Patch Program
1.11 Setup after installing ft control software
1.12 Connecting and Configuring Options
1.13 Enabling OS Boot Monitoring Function
1.14 Backing up System Information
1.15 Setup Procedures upon Installing Guest OS
Setup completed
Express5800/R320d-E4, R320d-M4 Installation Guide (VMware 5.5)
Use External Storage
1.4 Enabling FC card
1.6 Setting HBA configuration by using QLogic
1. Setup Procedure
13

Advertisement

Table of Contents
loading

Table of Contents