ABB PowerValue 11/31 T Operating Manual page 22

10 kva, 10 kva b, 10 kva b2, 10 kva s, 20 kva, 20 kva b, 20 kva s
Hide thumbs Also See for PowerValue 11/31 T:
Table of Contents

Advertisement

Dual Input Feed
1. Connect the neutral cable to the neutral terminal (mains 1 and mains 2).
2. Connect the 3 pin connector provided with the UPS between terminals L1, L2 and L3.
3. Connect the phase cables accordingly.
Modifications reserved
Page 21/49
3 PIN for connecting
L1,L2,L3
Figure 9: 3 pin connector installation
Figure 10: Dual feed (11) wiring diagram
Terminal block cover

Advertisement

Table of Contents
loading

Table of Contents