When the module is ready for operation, the text "OK" appears in the field to the
right of the pushbutton (see Fig. 3-7).
In this case, the station address is displayed along with the additional current
bus parameters and version data.
Fig. 3-7
9. To display the stations, choose Read.
When the module is ready for operation, the system generates a list of all the
active stations on the bus.
The symbols for indicating the operating mode of the station have the following
meanings:
– An empty checkbox with a gray background (same background color as the
tab page): no partner device found
– Empty checkbox with a light background: passive station (e.g. DP slave)
– Checkmark on a light background: active station (e.g. DP master)
– Checkmark on a gray background: active station ready to be integrated in
the network
Note
This generates considerable load on the bus and may take a few seconds.
10.To complete the process of setting and diagnosing the PC/PG interface, choose
OK, OK and Continue >.
 Siemens AG, 2004. All rights reserved
SINAMICS S120 Getting Started with the STARTER Commissioning Tool – 04.2004 Edition
SIMATIC NET diagnostics – CP5511 (PROFIBUS) after the test
Creating the Drive Project OFFLINE
3-35

Advertisement

Table of Contents
loading

Table of Contents