Creating the Drive Project ONLINE
Fig. 5-9
6. Once the automatic commissioning is complete, choose Close.
In the project navigator, all the drive unit components that have been found are
displayed with, for example, the control unit, infeed, and drive (see
Fig. 5-10).
Fig. 5-10
7. Choose Disconnect from target system.
The drive unit, components, and drives are installed in the STARTER project.
You now just have to configure the drive motors and check the topology.
To do so, proceed as described in Section 5.4.
5-66
Close automatic commissioning
Choose Disconnect from
target system.
Configuration with, for example, control
unit, infeed, and drive.
Automatic configuration
SINAMICS S120 Getting Started with the STARTER Commissioning Tool – 04.2004 Edition