Huawei FusionModule1000A40 Commissioning Manual page 47

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
Figure 7-11 Loop 2 FIRE RELAY indicator on
Step 8 Check whether the electrical actuator has been activated.
Step 9 Commission the pneumatic switch.
1.
Issue 04 (2020-01-17)
Pull up the reset button on the pneumatic switch to short-circuit the cables within to
simulate an extinguishant release.
Figure 7-12 Pressure switch
The extinguishant control panel generates a LOCAL FIRE alarm, and Extinguishant Release
indicator turns on. The warning sign is steady on.
LOCAL FIRE terminal generates a LOCAL FIRE alarm signal.
Copyright © Huawei Technologies Co., Ltd.
7 System Commissioning
41