Installing the EPS75-4815AF Power System in the ETSI Cabinet
1
T o p
B o tto m
N63E cabinet
1
Fix the two mounting ears on the power system by
using six M3 screws.
d
Cable Connection of the UPM
L O A D 3 (-)
L O A D 4 (-)
A C -L
A B
A C -N
To the 110 V /220 V neutral wire
To the 110 V /220 V live wire
T o p
B o tto m
T63 cabinet
L O A D 3 (+ )
L O A D 4 (+ )
G N D
To the grounding
2
2
Determine the position of installing the power system
on the mount bar of the cabinet. Then, install the
captive nuts in the corresponding holes. Fix the power
system in the cabinet by using four screws.
DANGER
Before installing the AC input power cables, install an
upper-level AC input circuit breaker to protect the system.
Before installing the AC input power cables, switch off
the corresponding upper-level AC input circuit breaker.
A
To the storage battery (-)
B
To the storage battery (+)