Installation Flow - Huawei OptiX OSN 2500 Quick Installation Manual

Hide thumbs Also See for OptiX OSN 2500:
Table of Contents

Advertisement

Installation Flow

Page 5
Page
the Top and at the
22
Page
23 to
29
Page
Cabinet Indicator
30
Page
31 to
34
Page
35 to
37
Page
38 to
E3/T3/E4/STM-
39
Page
40 to
41
Ethernet Cables
Page
42 to
43
Page
44
Page
45
Management Cable
Before You Start
Exterior of the
OptiX OSN
2500 Subrack
Cable Holes on
Bottom of the
N63E Cabinet
Installing and
Routing Power
Cables and
PGND Cables
Installing and
Routing the
Cables
Installing and
Routing the
Alarm Cables
E1/T1 Cables
and E1/T1
Interface
Installing and
Routing the
1 Cables
Installing and
Routing the
Installing and
Routing the IF
Cables
Installing and
Routing the
External Clock
Cables
Installing and
Routing the
Network
Start
Page 1
Precautions
Tools for
Page 2
Installation
Page 3
Cables
Regulation and
Page 4
Precautions for
Board Handling
Introduction to
Page 5
the OptiX OSN
2500 Equipment
Page 6
Installing
to 21
Components
Page
Installing and
22 to
Routing Cables
45
Page
Installing and
46 to
Routing the
49
Fibers
Installing
Page
Orderwire
50
Phones
Page
Checking the
51 to
Installation
52
Checking
Page
Optical Fiber
53
Attenuation
Page
Engineering
Engineering
54 to
Labels
Labels
56
Page
Assembling
57 to
Cable
59
Connectors
End
Positions of the
Page 6
Installation
Holes
Installing the
Page 7
Subrack
Checking the
Page 8
Power Jumpers
on the Board
Installing Fiber
Page 9
Management
to 10
Trays
Page
Installing the
11 to
SS61COA
13
Page
14 to
Installing the
16
SS62COA
Page
Installing the
17 to
RPC Frame
18
Page
Installing the
19
DCM
Page
Installing the
20 to
UPM Power
21
System
Page
Installing and
46 to
Routing the
47
External Fibers
Page
Installing and
48 to
Routing the
49
Internal Fibers

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents