Preparation For Installation On Upstream Connection Machine Side [Staple Finisher-D1 Only]; Connecting To Host Machine - Canon Staple Finisher-D1 Service Manual

Hide thumbs Also See for Staple Finisher-D1:
Table of Contents

Advertisement

Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only]

Connecting to Host Machine

1) Remove three covers on the left side of the host machine.
2) Using four screws, attach two latch catches (front and rear) on the left side of the host
machine.
x4
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Host Machine
F-6-36
F-6-36
F-6-37
F-6-37
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Host Machine
3) Attach the positioning pin using two screws.
MEMO:
The latch catch has three
screw holes. Use the upper
and lower screw holes to
attach the latch catch. Do
not use the center screw
hole.
The two latch catches are
identical to each other.
x2
6-17
F-6-38
F-6-38
6-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Booklet finisher-d1

Table of Contents