Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only]
■
Connecting to Host Machine
1) Remove three covers on the left side of the host machine.
2) Using four screws, attach two latch catches (front and rear) on the left side of the host
machine.
x4
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Host Machine
F-6-36
F-6-36
F-6-37
F-6-37
6
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Host Machine
3) Attach the positioning pin using two screws.
MEMO:
•
The latch catch has three
screw holes. Use the upper
and lower screw holes to
attach the latch catch. Do
not use the center screw
hole.
The two latch catches are
•
identical to each other.
x2
6-17
F-6-38
F-6-38
6-17