6) Close the front cover of the finisher.
<Staple Finisher-D1>
F-6-61
F-6-61
8) Using a screw, secure the shunt cable to the upstream connection
machine.
x1
6
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
<Booklet Finisher-D1>
Caution:
When attaching the shunt cable to the host machine, remove a screw from the
rear lower cover of the host machine, and insert the shunt cable to the space of
the rear lower cover. Then, tighten the removed screw, together with the shunt
cable and the rear lower cover.
x1
F-6-64
F-6-64
6
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
7) Using two screws, attach the shunt cable unit on the lower rear side.
x2
F-6-62
F-6-62
F-6-65
F-6-65
6-25
F-6-63
F-6-63
6-25