Huawei PDU8000 Series User Manual page 61

Modular precision pdc v2.0
Hide thumbs Also See for PDU8000 Series:
Table of Contents

Advertisement

PDU8000 Modular Precision PDC V2.0
User Manual
Figure 5-28 Cable holes at the bottom
(1) Power cable outlet hole
Precautions
Connection Method
Step 1 Route a cable into the cabinet and bind it to a nearby beam.
Step 2 Pull the cable to the copper bar to which the cable is to be connected, determine the cable
length, and mark the cable at the position where the cable is to be cut.
Step 3 Pull the marked cable out of the cabinet, cut the cable from the marked position, strip the
cable, and crimp a terminal.
Issue 03 (2018-01-25)
Ensure that all circuit breakers, including upstream output circuit breakers, are switched
off before connecting cables.
OT terminals and DT terminals must be coated with a heat shrink tubing.
This document uses the dual-input top cable routing and single-input bottom cable routing as
examples. Cable connections for other scenarios are similar.
Remove the rodent-proof mesh at the top or bottom based on the cable routing scenario.
Keep away from cabinets when preparing cables to prevent cable scraps from entering the
cabinets. Cable scraps may cause ignition during power-on and result in personal injury
and device damage.
After installing cables, clean the cabinet top, bottom, copper bar wiring positions, and
other positions. Ensure that there is no dust or scraps inside and around cabinets.
Prepare terminals onsite. The length of the copper wire should be the same as that of the
part of the terminal that covers the conductor.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) Power cable inlet hole
5 Installation Guide
52

Advertisement

Table of Contents
loading

Table of Contents