Connection Diagram - Mitsubishi Electric GOT1000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

10.3 Connection Diagram

The following diagram shows the connection between the
GOT and the PLC.
10.3.1 RS-232 cable
Connection diagram
RS232 connection diagram 1)
GOT side
CD
1
RD(RXD)
2
SD(TXD)
3
ER(DTR)
4
SG
5
DR(DSR)
6
RS(RTS)
7
CS(CTS)
8
NC
9
FG
-
*1
Connect FG grounding to the appropriate part of a cable
shield line.
Precautions when preparing a cable
(1) Cable length
The length of the RS-232 cable must be 15m or less.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(3) Shinko Technos indicating controller side connector
Use the connector compatible with the Shinko Technos
indicating controller side.
For details, refer to the user's manual of the Shinko
Technos indicating controller.
10 - 6
10. CONNECTION TO SHINKO TECHNOS INDICATING CONTROLLER
10.3 Connection Diagram
Indicating
controller side
COM
TX
RX
*1

Advertisement

Table of Contents
loading

Table of Contents