Preparing Terminals - Huawei PDU8000 User Manual

Modular precision power distribution cabinet
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 Modular Precision Power Distribution Cabinet
User Manual (1100 mm Deep)
Wiring
Terminal

5.4.3 Preparing Terminals

Figure
end terminals.
Figure 5-17 Preparing a DT terminal
(1) Cable
Issue 01 (2019-02-25)
Rated
Current
40 A < I ≤ 63
A
5-17,
Figure
5-18, and
Terminals must be coated with a heat shrink tubing.
(2) Heat shrink tubing
Copyright © Huawei Technologies Co., Ltd.
Cable
Terminal/Bolt
Diameter
Specifications
2
10 mm
OT-M6
Figure 5-19
respectively show how to prepare DT, OT, and cord
(3) DT terminal
5 Installation Guide
Recommended
Torque
4.9 N· m
(4) Hydraulic pliers
(5) Heat gun
49

Advertisement

Table of Contents
loading

Table of Contents