Step 5 After the MDU screen starts, log in to the system as the Admin or Operator user (the preset
password is 000001 for both types of users), and perform operations as shown in
Figure 6-3 Settings Wizard
Step 6 (Optional) After the quick settings are complete, if the monitoring page displays alarms, clear
the alarms.
Step 7 Turn on the input switches on the front panel of the PDC.
Step 8 Switch on the output circuit breakers except reserved circuit breakers in the PDC in sequence
to power on the corresponding devices and check whether the monitoring parameters on the
MDU screen are correct.
Step 9 (Optional) Power off the PDC.
1.
Issue 01 (2019-02-25)
The input power circuit breaker refers to the output circuit breaker that controls power supply from the
upstream power distribution equipment to the PDC.
If this is the initial startup, set the language, time, date, network parameters, and system
parameters by using the Settings Wizard.
If this is not the initial startup and these parameters have been set before, the system uses
the existing settings by default.
The figures are for reference only. The actual parameter values prevail.
For system security purposes, change the preset password upon first login.
Turn off the output switches in the PDC.