NetCol8000-E220 Modular Indirect Evaporative
Cooling System
User Manual
Figure 3-1 Installation clearances (unit: mm)
(1) Electric control box
Check the auxiliary facilities before installing the NetCol8000 is in position.
●
●
●
Checking the drainage capacity
There is a drainage ditch with sufficient drainage capacity around the foundation.
● The design and installation of the condensate water trap must meet the
requirements shown in
● The layout and installation of water pipes facilitate the maintenance of the
NetCol8000.
Issue 06 (2020-08-19)
The concrete foundation provided is sufficiently strong and rigid to bear all
weight and vibration during the operation of the NetCol8000.
The dimensions (width and depth) of the concrete foundation are 50–100 mm
greater than the dimensions (width and depth) of the NetCol8000.
The surface of the concrete foundation is flat and clean.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
Figure
3-2.
3 Installation Guide
26