Installing the new node
You are now ready to install the new node.
Procedure
1. Physically rack the new node into the place of the old node.
2. Connect the cables to the new node, according your labelling.
3. Power up the new node and ensure that BALI loads again.
4. If the customer is using SAN attached, and/or host group security, update this to
reflect the changes that are being made to the WWN, as you documented previously
in Preparing the node, step 5.
5. Add the new node as a managed server on the SMU.
6. From the drop down in the SMU, select the existing Cluster.
7. Go into Home > Sever Settings > Cluster Configuration and click on AddCluster
node.
8. Complete the add cluster node wizard, selecting the new node which will appear
in the selection box, and enter the supervisor password where prompted (the
default is supervisor). Upon completion of the wizard, the new node will reboot
and join the cluster.
Finalizing and verifying the server configuration
On the new server:
Procedure
1. Navigate to Home > Status & Monitoring > System Monitor to verify the server
status:
Hitachi NAS Platform and Hitachi Unified Storage Series 4000 Hardware Reference
Appendix A: Server replacement procedures
Installing the new node
112