Shutting Down The Servers You Are Replacing - Hitachi NAS Platform 4000 Series Hardware Reference Manual

Nas platform and hitachi unified storage
Hide thumbs Also See for NAS Platform 4000 Series:
Table of Contents

Advertisement

The new server firmware version must match the failed server; otherwise, the
server cannot properly restore from the backup file. See the release notes and the
System Installation Guide for release-specific requirements.
4. Navigate to Home > Server Settings > IP Addresses to obtain:
Admin IP address and name
Cluster node IP address
The evs list command also displays these IP addresses.

Shutting down the servers you are replacing

On the servers that you are replacing:
Procedure
1. From the server console, issue the command: cn node shutdown --ship --
powerdown
(where node represents the targeted node)
Wait until the console displays Information: Server has shut down, and the
rear panel LEDs turn off. The PSU and server fans continue to run until you remove
the power cables from the PSU module. See the appropriate system component
section for more information.
2. Unplug the power cords from the power supplies.
3. Wait approximately 15 seconds, and then confirm the NVRAM status LED is off.
Hitachi NAS Platform and Hitachi Unified Storage Series 4000 Hardware Reference
Note: This specific powerdown command prepares the system for both
shipping, and potential long-term, post-replacement storage.
Appendix A: Server replacement procedures
Shutting down the servers you are replacing
117

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nas platform 4040Nas platform 4060Nas platform 4080Nas platform 41004000 series4040 ... Show all

Table of Contents