Hitachi NAS Platform 4000 Series Hardware Reference Manual page 18

Nas platform and hitachi unified storage
Hide thumbs Also See for NAS Platform 4000 Series:
Table of Contents

Advertisement

To help prevent serious injuries, load the components in the storage cabinet in the
prescribed order:
1. If present, install the rack stabilizer plate to the front of the system cabinet.
2. Load the Fibre Channel (FC) switches in the storage cabinet at the positions
recommended in the System Installation Guide. The positions can be adjusted
according to a specific storage cabinet configuration.
3. Load and position the server(s) directly above the FC switches, if used in your
configuration.
4. The System Management Unit (SMU), if used in your configuration, should be
placed directly below the FC switches.
5. The first storage enclosure should be positioned at the bottom of the storage
cabinet. Additional enclosures are then placed above existing enclosures, going
towards the top of the system cabinet.
6. Once the bottom half of the storage cabinet has been filled, the top half of the
storage cabinet can be filled. Begin by placing a storage component directly above
the server and then fill upwards.
Hitachi NAS Platform and Hitachi Unified Storage Series 4000 Hardware Reference
Chapter 2: Safety information
Safety and handling precautions
18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nas platform 4040Nas platform 4060Nas platform 4080Nas platform 41004000 series4040 ... Show all

Table of Contents