Shutting Down The Servers You Are Replacing - Hitachi 3090 G2 Hardware Reference Manual

Nas platform
Hide thumbs Also See for 3090 G2:
Table of Contents

Advertisement

Shutting down the servers you are replacing

On the servers that you are replacing:
Procedure
1. From the server console, issue the command: cn node shutdown --ship --
powerdown
(where node represents the targeted node)
Wait until the console displays Information: Server has shut down, and the
rear panel LEDs turn off. The PSU and server fans continue to run until you remove
the power cables from the PSU module. See the appropriate system component
section for more information.
2. Unplug the power cords from the power supplies.
3. Wait approximately 15 seconds, and then confirm the NVRAM status LED is off.
If the LED is flashing or fixed, press and hold the reset button for five seconds or
until the LED starts flashing. The battery disables when you release the reset
button.
4. Use the following rear panel figure and table to identify and label the cabling
placement on the existing server.
Figure 25 Rear view of server - HNAS 3080 and 3090 models
Item
1
2
Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference
Note: This specific powerdown command prepares the system for both
shipping, and potential long-term, post-replacement storage.
Labels
Appendix A: Server replacement procedures
Shutting down the servers you are replacing
Ports
1
10 GbE data network
2
10 GbE data network
1
Gigabit Ethernet network port
2
Gigabit Ethernet network port
3
Gigabit Ethernet network port
Connections
103

Advertisement

Table of Contents
loading

This manual is also suitable for:

3080 g23080

Table of Contents