Checking After Commissioning - Huawei NetCol5000-C030 User Manual

In-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C030:
Table of Contents

Advertisement

NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual
Figure 4-35 Drainage needle valves of the heat exchanger (NetCol5000-C030/
C032)
(1) Drainage needle valves 1
Step 2 Connect a nitrogen cylinder to the drainage needle valve 1 of the heat exchanger,
set the intake pressure to 0.5 MPa, and blow nitrogen into the valve for 10
minutes so that the water flows out of the drainage needle valve 2.
Step 3 Connect the nitrogen cylinder to the drainage needle valve 2 of the heat
exchanger, set the intake pressure to 0.5 MPa, and blow nitrogen into the valve for
10 minutes, so that the water flows out of the drainage needle valve 1.
Step 4 Stop the nitrogen cylinder and wait for 20 minutes.
Step 5 Start the nitrogen cylinder and repeat
----End

4.8 Checking After Commissioning

Table 4-12
Table 4-12 Commissioning checklist
Check Item
No oil stain exists on the copper pipe thermal insulation
foam or bottom plate, or it has been cleaned.
The needle valve plug is secured (torque of 0.45±0.05 N
m), and valve bonnet is tightened.
The foreign matter inside the water pan and bottom plate
is cleaned up.
The air filter is correctly installed according to the air flow
direction on the frame.
Issue 04 (2021-03-15)
lists the commissioning checklist.
Copyright © Huawei Technologies Co., Ltd.
4 Power-On Commissioning
(2) Drainage needle valves 2
Step 2–Step 4
for three times.
Actual Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
122