Unpacking - Huawei NetCol5000-C030 User Manual

In-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C030:
Table of Contents

Advertisement

NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual
Figure 3-14 Holes (NetCol5000-C030/C032, top and bottom pipe routing) (unit:
mm)
(1) Humidifier water inlet pipe hole
(3) Forcible drainpipe hole
(5) Chilled water inlet pipe hole
(7) Signal cable hole

3.2 Unpacking

Prerequisites
To avoid damage during transportation, move the smart cooling product closest to
the installation position before unpacking.
Procedure
Step 1 Inspect the outer packaging for signs of damage. If any damage is found, contact
the shipping company immediately.
Step 2 Remove the packaging.
1.
2.
Step 3 Check the type and quantity of fittings against the packing list. If fittings are
missing or inconsistent with those in the packing list, contact your local Huawei
office immediately.
----End
Issue 04 (2021-03-15)
Cut off the straps and remove the cartons.
Inspect the cabinet exterior for signs of collision or scratches. If any damage is
found, contact the shipping company immediately.
Copyright © Huawei Technologies Co., Ltd.
(2) Ground cable hole
(4) Chilled water outlet pipe hole
(6) Power cable hole
3 Installation
44

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol5000-c032Netcol5000-c065

Table of Contents