Swing Machinery - Komatsu PC20R-8 Shop Manual

Hydraulic excavator
Hide thumbs Also See for PC20R-8:
Table of Contents

Advertisement

REMOVAL AND INSTALLATION
6 - Attach the platform (6) to some hoisting tackle and
apply a slight tension to the cables.
7 - Loosen lock platform screws (24) and raise it.
H Check that the platform completely free while it is
being raised, and that no other parts are da-
maged.
8 - Place a block "A" (approx. 15 cm).
H Keep the hoisting cables connected to platform
with slight tension.
PC20R-8
9 - Disconnect the pipes (8) and the drainage pipe (9).
H Mark the tubes to avoid exchanging them during
re-assembly.
H Plug the tubes to prevent entry of impurities.
10 - Take out the screws (10) and remove the swing ma-
chinery (11).
Swing machinery: 27 kg
PC27R-8
11 - Disconnect the delivery pipe (12), the exhaust pipe
(13) and the drainage pipe (14).
H Mark the tubes to avoid exchanging them during
re-assembly.
H Plug the tubes to prevent entry of impurities.
10 - Take out the screws (15) (N

swing machinery (16).

Swing machinery: 32 kg
30-44
. 6) and remove the
o
7
PC20R-8
9
11
10
PC27R-8
12
16
15
SWING MACHINERY
6
RKPA3321
A
RKPA3400
8
RKPA2531
13
14
RKPA2303
PC20R-8 PC27R-8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc27r-8F30791F31103

Table of Contents