Boom Swing Cylinder - Komatsu PC20R-8 Shop Manual

Hydraulic excavator
Hide thumbs Also See for PC20R-8:
Table of Contents

Advertisement

REMOVAL AND INSTALLATION
8 - Loosen the screws (8) and remove the plate (9).
9 - Put a sling round the cylinder (10) and apply a slight
tension to the cables.
10 - Take out the pin (11) and remove the cylinder (10).
Boom swing cylinder: PC20R-8: 17 kg
INSTALLATION OF THE

BOOM SWING CYLINDER

To install, reverse the removal procedure.
.
H Adjust the shim thickness so that the clearance be-
tween cylinder (10) and swing bracket (2) is below 1
mm.
When aligning the positions between the hole and
the pin, turn the engine over at low idling.
Do not insert fingers in the holes to check alignment.
Internal bushings: ASL800050
1 - Start the engine and bleed the air from the cylinder.
(For details, see «20. CONTROLS AND ADJUST-
MENTS»).
H Adjust the shim thickness so that the clearance be-
tween cylinder (10) and revolving frame is below 1
mm.
30-62
PC27R-8: 22 kg
BOOM SWING CYLINDER
10
PC20R-8 PC27R-8
8
9
11
RKPA3640
RKP06320
RKP06330

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc27r-8F30791F31103

Table of Contents