ADJUSTING BLADE SPEED
Step 1 – Set the flow control to "0" position.
Step 2 – Press the saw blade start button to start the blade.
Step 3 – Turn the blade speed control knob to adjust the blade speed. The blade speed should be
adjusted based on the size and the material of the workpiece.
BREAKING‐IN THE BLADE
When a new saw blade is used, be sure to first break in the blade before using it for actual, extended
operation. Failure to break in the blade will result in less than optimum efficiency. To perform this
break‐in operation, the following instructions should be followed:
Step 1 ‐ Reduce the blade speed to one‐half of its normal setting.
Step 2 ‐ Lengthen the cutting time to 2‐3 times of what is normally required.
Step 3 ‐ The complete break‐in operation requires cutting on a 645 mm
for 5 times.
Step 4‐ After the break‐in operation is completed, set all parameters back to normal settings.
PLACING WORKPIECE ONTO WORKBED
Step 1 – Press the saw bow up button and elevate the saw bow until it reaches to its highest point.
Step 2 – Press the front vise open and rear vise open buttons to open vises.
Step 3 – Loosen the vertical roller lock handles and fully open the vertical rollers.
Step 4 – Carefully place the workpiece onto the work feed table to where it extends approximately
30mm (1.2") beyond the rear vise toward the front vise.
4‐24
Vertical Roller
2
(25.4 square inches) section