Inspection of the DC link capacitors of the PM modules

Caution
!
After the devices have been non–operational in a no–voltage condition for
more than two years, the DC link capacitors must be reformed. If this is not
done, when the devices are switched on they can be damaged.
Date of manufactu-
The production date can be derived from the following assignment to the serial
re
number (e.g. S T-S9VVVVVVV für 2004, September):
Table 11-4
A
B
C
D
E
F
H
J
K
L
M
N
P
R
S
T
U
V
W
X
The serial number is stamped on the type plate.
When forming, the DC link capacitors are subject to a defined voltage
and a limited current. This means that the internal relationships requi-
red for the DC link capacitors to function are restored.
Note
It is important that the storage period is calculated from the date of manufacture
and not from the date that the equipment was shipped.
© Siemens AG 2012 All Rights Reserved
SIMODRIVE 611 Configuration Manual (PJU) – 02/2012 Edition
11.4 Inspection of the DC link capacitors of the PM modules
Production year a und Production month
Key
Production year
1990, 2010
1991, 2011
1992, 2012
1993, 2013
1994, 2014
1995, 2015
1996, 2016
1997, 2017
1998, 2018
1999, 2019
2000, 2020
2001, 2021
2002, 2022
2003, 2023
2004, 2024
2005, 2025
2006, 2026
2007, 2027
2008, 2028
2009, 2029
11 Spare Parts and Service
Key
Production month
1
January
2
February
3
March
4
April
5
May
6
June
7
July
8
August
9
September
O
October
N
November
D
December
11
11-387

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents