Creating the Stream of Generated and Expected Data
How to Specify Events and Reactions to Events
The sequence now shows that branches have been inserted.
Figure 80
Sequence With Branches on Events
If you now run the test, you can terminate the Payload test by clicking the
CMD 1 checkbox. You can then resume the test by clicking the CMD 0
checkbox. Block 4 and block 5 will be executed, and the test will finish.
154
HP 81200 Data Generator/Analyzer Platform User Guide, Revision 2.1