GE Kelman Minitrans Installation Manual page 55

Transformer oil dissolved gas and moisture monitor
Hide thumbs Also See for Kelman Minitrans:
Table of Contents

Advertisement

studs are larger than M6 x 40 mm, then the studs must be removed and replaced with
the supplied A2 stainless steel M6 bolts torqued to 12 Nm.
[In a retrofit scenario only.] Clearance is required at each side of the product in its
original position. See Figure L-2 for clearance requirements.
Note:
Figure L-2 shows additional clearance required for metal framing. It does not
include clearance required for piping, wiring etc.
Note:
Use appropriate protective gloves for handling metallic surfaces.
Figure L-2: Clearance requirements
L.3
Required Tools
10 mm nut spinner (or equivalent)
10 mm spanner
5 mm Allen key
Torque tool (recommended)
MA-005 - Minitrans Installation Manual - Rev 4.5
13-Aug-20
Page 55 of 86