7 Setting and procedure for operation
7.7.3 Initial setting
This section explains the setting of the operating condition for phase wire system, primary voltage,
primary current, current demand time, and voltage demand time, primary voltage of VT, secondary
voltage of VT, primary current of CT that are required for measurement. Once each value is set,
these values will be stored in the nonvolatile memory of the module, so that reconfiguration is not
needed. You can also perform the setting using sequence program. In this case, you need to create
a program, as referring to Chapter 8.
Follow the procedure below for each setting.
(1) Check the current setting
(2) Set the Buffer memory
(1) Check the current setting
1) From the "Online" menu, select "Monitor" – "Buffer memory batch ...". The dialog box to
monitor all buffer memories. After setting the address as shown below, click the
Start monitoring button to check the current buffer memory status.
Module initial address:
Buffer memory address:
(Display: 16-bit integer, numerical value: check the number in decimal)
2) Check each item. The following shows items for operating condition settings. For specific
setting value, see the provided references.
Figure 7.7.3-1 Dialog box to monitor all buffer memories (a case where the module is attached to the slot 0)
Table 7.7.3-1 List of setting items
Buffer memory
address
Un\G0
Un\G1
Un\G2
Un\G3
Un\G4
Un\G5
Un\G6
Un\G7
Set the initial address of this module.
0
Item
Phase wire system
Primary voltage
Primary current
Current demand time
Electric power demand time
Primary voltage of VT
Secondary voltage of VT
Primary current of CT
7 - 27
QE81WH
Reference
Section 6.2.1
Section 6.2.2
Section 6.2.3
Section 6.2.4
Section 6.2.5
Section 6.2.2
Section 6.2.2
Section 6.2.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qe81wh

Table of Contents