Figure 7-2 Power-on process of LUNA2000-2.0MWH-2H0
● Check the equipment before power-on. For details, see the corresponding user
● Before the first power-on, check that cables are correctly connected.
● Incorrect cable connections may cause damage to the STS or the Smart PCS.
Pro
ced
ure
1
2
Issue 02 (2021-11-15)
NO TICE
manual.
Verify the cable connections between the STS and the Smart PCS for the initial
power-on. If any exception occurs during the power-on process, stop the
operation. You can proceed with the operation only after the exception has
been handled.
Item
Powering on the STS (including the STS Auxiliary
Transformer)
Powering On the Smart Array Controller (SACU)
Copyright © Huawei Technologies Co., Ltd.
7 Powering On the System
Remarks
Corresponding
to number 1,
number 2, and
number 3 in the
power-on
flowchart
Corresponding
to number 4 in
the power-on
flowchart