Chapter 4 - Site Preparation; Unpacking And Inspection - Fujitsu TeamPoS 3000 XT Installation & Maintenance Manual

Table of Contents

Advertisement

TeamPoS 3000 XT

Chapter 4 - Site Preparation

This chapter provides the following pre-installation details for the TeamPoS 3000 XT:
• Shipment inspection and return
• Anti-static protection
• Electrical supply requirements
• Mains power cables
• Warning labels
The procedures assume that in-store wiring for terminals, peripherals, and terminal-to-
terminal communications have been installed.
4.1.

Unpacking and Inspection

TeamPoS Series terminals are thoroughly inspected prior to shipment; however, damage
can occur during transit. Any damage to the terminal can lead to problems after
installation. Before accepting a shipment, inspect all shipping containers for external
damage. Ensure that all packages listed on the shipment billing form have been delivered.
Carefully unwrap and inspect all equipment:
• Inspect the exterior of each shipping box noting damage on the shipping
documents so that the carrier has a record.
• Verify that all the accessories listed on the packing list have been included in the
shipment. Report shortages and damage to CustomerCare. The customer needs to
provide the sales order number and a description of the piece of equipment
damaged. The customer should then telephone 1-800-780-5525 and a
CustomerCare representative will arrange for replacement. CustomerCare is not
responsible for equipment damaged by the customer after it is delivered.
• Inspect the exterior of each unit for any obvious physical damage (scratches or
abrasion on painted or display surfaces, or on plastic surfaces) that could have
occurred during shipping.
• Damaged equipment received from a source other than Fujitsu Transaction
Solutions Inc.'s Foothill Ranch facility should be reported to the sender.
D900000172
Installation and Maintenance Manual
4-1

Advertisement

Table of Contents
loading

Table of Contents