Replacing A Smart U Space Manager (Connected To A Rack Environment Unit) - Huawei V500R003C00 Maintenance Manual

Smart modular data center
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Maintenance Guide
6.4.22 Replacing a Smart U Space Manager (Connected to a Rack
Environment Unit)
Impact on the System
The U space status of the equipment cannot be displayed during replacement.
Preparations
Figure 6-67 Smart U space manager installation diagram (main control box attached to the top of
the cabinet interior)
(1) Rack environment unit
(4) Asset detection strip (42 U detection point)
Procedure
Step 1 (Optional) If U space e-labels are faulty, perform the following steps to replace them.
1.
2.
Step 2 (Optional) If the asset detection strip is faulty, perform the following steps to replace it.
Issue 05 (2020-03-25)
Tools: ESD gloves, label, marker
Material: smart U space manager
Remove faulty U space e-labels from the customer equipment and the asset detection
strip.
Record the asset according to the commissioning guide.
Copyright © Huawei Technologies Co., Ltd.
(2) Fastener
(3) Main control box
(5) U space e-label (6) Server
6 Parts Replacement
110