Installation, Commissioning And Service Record Sheets - Panasonic PRO-HT Tank Series Technical Manual

Table of Contents

Advertisement

A.9. Installation, Commissioning and Service record sheets
The code of practice for the installation, commissioning & servicing of mains pressure hot water storage
Installation, Commissioning and Service Record Log Book
Customer details
Name
Address
!
Important
1. Please, keep the Log Book in a safe place for future reference.
2. This Log Book is to be completed in full by the competent person(s) who commis-
sioned the equipment and then handed to the customer. When this is done, the Log
Book is a commissioning certificate that can be accepted as evidence of compli-
ance with the appropriate Building Regulations.
3. Failure to install and commission this appliance to the manufacturer's instructions
may invalidate the warranty.
The above does not affect your statutory rights.
INSTALLER & COMMISSIONING ENGINEER DETAILS
Installer details
Company name
Address
Installer name
REGISTRATION DETAILS
REGISTERED OPERATIVE ID CARD No.
(IF APPLICABLE)
COMMISSIONING ENGINEER (IF DIFFERENT)
Name
Address
TEL No.
REGISTRATION DETAILS
REGISTERED OPERATIVE ID CARD No.
(IF APPLICABLE)
IT IS THE RESPONSIBILITY OF THE INSTALLER TO COMPLETE THIS LOGBOOK AND PASS IT
ON TO THE CUSTOMER. FAILURE TO DO SO MAY INVALIDATE THE CYLINDER WARRANTY.
PAW-VP•LDHW - Technical Manual – 2020-07
TEL No.
Date
TEL No.
Date
Appendix
A
111

Advertisement

Table of Contents
loading

Table of Contents