File Bay Installation - NEC VERSA DOCK Manual

Versa tools: accessories and solutions
Hide thumbs Also See for VERSA DOCK:
Table of Contents

Advertisement

Locating and connecting the cables to the VersaBay III device
A - IDE signal cable port B - Power cable port C - VersaBay III cable port
D - VersaBay III cable E - Power cable F - IDE signal cable
2. Connect the cables to the appropriate ports on the back of the
optional VersaBay III Adapter Kit.
You are now ready to install the optional VersaBay III Adapter Kit into
the file bay. (See the instructions in "File Bay Installation" for details.)

File Bay Installation

Install an IDE device or the optional VersaBay III Adapter Kit in the file
bay as follows.
1. Before handling any internal components, discharge static electricity
from yourself and your clothing by touching a nearby metal surface.
2. Remove the NEC Versa Dock docking tray, front panel, and cable
cover. (See the instructions in "Removing Trays, Panels, and
Covers" for details.)
Installing Options and Connecting Devices 4-11

Advertisement

Table of Contents
loading

Table of Contents