Power-Up And Power-Down Procedures; Power-Up Procedure; Power Down Procedure - HP D5970A - NetServer - LCII Installation Manual

Hp netserver lxr 8000 installation guide
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 2
Table 2-4. Reading PCI Hot Plug Slot LEDs to Determine Slot Status
Green
Amber
LED
LED
On
Off
On
On
Off
On
Off
Off
For more information on PCI Hot Plug boards, see Chapter 6, "Installing
Additional Boards."

Power-Up and Power-Down Procedures

Power-Up Procedure

1. Make sure that the server's power cord is connected to a power source, and
that the PWR light on each of the server's power supplies is flashing
green. (See Figure 2-6.)
2. Press the Power button on the control panel. (See Figure 2-2.)

Power Down Procedure

1. Log off all users. Back-up files. Follow instructions in your network
operating system (NOS) documentation to gracefully shut down all
networking software and applications.
2. Press the power switch on the HP NetServer's control panel when
prompted by the operating system. Normally, this is the complete
procedure.
NOTE
The power supplies will continue to provide standby current to
the NetServer until the power cord is disconnected.
14
Indicates This Status
Power to the slot is on, and the slot is operating
normally. Do not remove the board from the slot.
Power to the slot is on, but the slot needs attention. Do
not remove the board from the slot.
Power to the slot is off, and the slot needs attention.
You can remove the board from this slot.
Power to the slot is off. You can remove the board from
this slot.
Controls, Indicators, and Ports

Advertisement

Table of Contents
loading

Table of Contents