Assembling The System; System Assembly Flowchart - Pioneer RM-V2550 Manual

Multi projection unit / projection screen kit / multi video processor / projection stand
Table of Contents

Advertisement

INSTALLATION AND ASSEMBLY

4. ASSEMBLING THE SYSTEM

(1) System assembly flowchart

Fix a cabinet on the projection stand.
Arrange the required number of
cabinets horizontally and connect
them between each other.
Connect the
cabinet for the
second stage.
Move the system
(up against the wall).
<See P. 48.>
Fix the adjusters.
Prevent tumbling down and fix the
anchors.
Connect the screen frames vertically.
Hook the screens on the cabinets (all).
Fix the screen frames and cabinets.
40
<See P. 43.>
<See P. 44.>
<See P. 46.>
2-stage configuration
NO
<See P. 48.>
<See P. 26.76.>
<See P. 49.>
<See P. 50.>
<See P. 53.>
3-stage configuration
With a 9-screen system, connect the
cabinet for the third stage after
connecting that for the second stage.
YES
Do you install the system up against
the wall?
Perform the system wiring on the
rear.
Check power supply operation, etc.
<See P. 58.>
<See P. 48.>
<See P. 48.>
<See P. 48.>

Advertisement

Table of Contents
loading

Table of Contents