NEC Express5800/320Fd-LR User Manual page 55

Nec servers user's guide
Hide thumbs Also See for Express5800/320Fd-LR:
Table of Contents

Advertisement

Steps to Install the Rack-mount Model to the Tower Conversion Kit
Follow the procedure below to install the devices to the tower conversion kit.
1.
Open the front door of the tower conversion kit.
If the door is locked, use the server-accessory key
to unlock.
2.
Confirm the spots to fix 8 core nuts on the front
of the chassis.
See the figure on the right for where to fix
the core nuts.
(4 on the front top and 4 on the front bottom.)
8 core nuts have been installed on the front of the
chassis.
3.
Insert the bracket from the front of the conversion
kit. Tuck the bracket firmly to the back.
Installing Server 3-15
Tower conversion kit (on the front top)
Tower conversion kit (on the front bottom)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/320fd-mrN8800-124fExp320jN8800-125fExp320k

Table of Contents