EPSON Stylus Photo 890/1280/1290
n
When installing the ASF assembly to FRAME, BOTTOM, make
C H E C K
sure the protrusion on the ASF fits in the installation hole in
P O I N T
FRAME, MIDDLE. (See Figure 4-32.)
n
When installing the ASF Unit, ensure the spur gear 32 in the
ASF Unit and the inner gear of the combination gear (14, 28) in
the DE Unit are meshed. (See Figure 4-32.)
n
When installing the ASF Unit, make sure the Hopper Assembly
is raised.
Stylus Photo 890
Combination Gear
14, 28
Installation Hole
Stylus Photo 1290
Combination Gear
14, 28
Installation Hole
Figure 4-32. Check Points in ASF Assembly
DISASSEMBLY AND ASSEMBLY
Gear 32
Protrusion
Gear 32
Protrusion
Disassembly Procedures
n
When connecting the cables for ASF HP sensor and MOTOR
C H E C K
ASSEMBLY, PF, set them in the cable clamp in the rear left part
P O I N T
of the ASF Unit as shown in the figure below:
Cable Clamp
Revision C
100