Ep Front Panel; Rackmount Installation; Ec Server Rackmount - Toshiba IP edge EP Installation Manual

Hide thumbs Also See for IP edge EP:
Table of Contents

Advertisement

RACKMOUNT INSTALLATION

EP Front Panel

Power Button
LEDs
EP Rear Panel
Connections
RACKMOUNT
INSTALLATION

EC SERVER RACKMOUNT

2-8
The IPedge EP servers has Two USB connectors, three LED indicators
and the power switch.
Power On/Off Button - This applies or removes system power. When the
power is turned off using this button main power is shut off but standby
power to the system remains on. To completely remove power from the
system use this button to shut down the system then, disconnect the DC
power cord.
Power LED - Indicates that system power is on when Illuminated.
Disk drive activity LED - Lights while the hard disk drive is accessed.
Network - Indicates activity on the LAN connection
The rear panel connectors and indicators are described below. Refer to
Figure
2-7.
DC power cord connector
Two USB connectors
VGA
LAN connection supports 10BASE-T, 100BASE-TX, and 1000BASE-
T, RJ45
The IPedge servers mount into standard 19 inch EIA Universal Spacing
racks and cabinets using the optional mounting rails.
The IPedge EC Server is 15 inches (381 mm) deep. Rails are not
included with the server chassis. The optional mounting rails are
designed for installation in two-post or four-post racks. Refer to the table
below for the Rail Kit part numbers.
EC Server Rail Kit
Four Post
Two Post
CAUTION! The IPedge EC and EM servers must only be installed in
an equipment rack using the mounting rails. The single
screw on each side of the front panel only secure the
chassis on the rails. They are not weight bearing.
EP Front Panel
Part Numbers:
I-EC-RL4-1A
I-EC-RL4-1A
Installation Manual
August, 2011

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip edge emIp edge ec

Table of Contents